Welcome to Xinlang Textile official website!

Drape and Shape Loss Solutions for Swimwear: Sample to Bulk Timeline

Source:Solutions / Time:2026-09-16

A realistic plan for developing swimwear with drape and shape loss solved, from first sample to repeat bulk.

Stage one: definition

Fix power to hold 4-8 kPa at 30% extension and the construction route. This is where most delays originate, because unclear targets cause repeat sampling. Because the fabric stays wet, stretched and chemically exposed for hours, target checks are made on a worn sample rather than flat fabric alone.

Stage two: laboratory sample

Request lab dips and a first fabric sample. Confirm against ISO 13934-1 modulus at 30% extension before cutting, then cut 3-5 pieces for fit. Keep ISO 13934-1 modulus at 30% extension named in the tech pack so every lot is measured the same way.

Drape and Shape Loss Solutions for Swimwear: Sample to Bulk Timeline

Stage three: wear trial

the garment stops following the body and looks loose appears during use. Run a two-week trial with pool training and beach use participants before approving bulk. Where swimwear is worn for pool training and beach use, set tolerances around that range of movement.

Stage four: pre-production

Produce 30-50 pieces from bulk materials. This exposes process variation that a hand-made sample hides. Any change to nylon and polyester knits at 190-230 GSM with high elastane requires re-testing against power to hold 4-8 kPa at 30% extension before bulk is released.

Stage five: repeat orders

Once approved, keep the recipe and report set together so the next order can be released without redevelopment. Past reports from ISO 13934-1 modulus at 30% extension help the mill reproduce the same recipe on the next order.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top