Drying Rate Why Shipments Get Rejected Over This
Many disputes come down to Drying Rate. Below is what inspectors check and why shipments fail.
The core definition
time for wet fabric to reach equilibrium. Working figures for Drying Rate normally sit around under 30 minutes for lightweight knits in mainstream production. Note AATCC 199 drying rate on the tech pack so nobody tests against an older revision.
Most common cause of failure
Results usually fall outside under 30 minutes for lightweight knits because the target was never written into the order. Record elastane content alongside Drying Rate, because blends shift the measured value. A result outside under 30 minutes for lightweight knits usually points to process drift rather than to the fibre itself.

How it is checked
Inspection and laboratory work both refer to AATCC 199 drying rate. Keeping reference values for Drying Rate lets suppliers quote without extra sampling rounds. Ask for conditioning details together with AATCC 199 drying rate, since both affect the reading.
Related faults
slow drying makes garments cold after training, so related complaints often point back to this single parameter. Working figures for Drying Rate normally sit around under 30 minutes for lightweight knits in mainstream production. Note AATCC 199 drying rate on the tech pack so nobody tests against an older revision.
Avoiding rejection
Agree targets, tolerances and the method before production, then test per lot rather than per shipment. Record elastane content alongside Drying Rate, because blends shift the measured value. A result outside under 30 minutes for lightweight knits usually points to process drift rather than to the fibre itself.